Stage 03 · Deployment
Colocation Deployment
Getting hardware into a data center and out the other side with a running inference cluster requires experience. We've done it — from single-server installs to multi-rack GPU clusters.
The Process
From loading dock to live inference.
01
Facility Coordination
We coordinate cage/cabinet assignment, cross-connects, and power circuit verification with your colocation provider.
02
Hardware Receiving
Equipment is received at the facility, inspected, and staged for installation. We verify every item against the BOM.
03
Physical Installation
Rack mounting, cable dressing, PDU wiring, and KVM/IPMI setup. We run cable labels and documentation while we install.
04
Power-On & BIOS
First boot, BIOS configuration, IPMI setup, and initial firmware updates. GPUs are tested under load before we leave.
05
OS & Driver Stack
Operating system installation, NVIDIA driver stack, CUDA toolkit, and any required cluster software.
06
Handoff & Documentation
Network diagram, serial number inventory, IPMI credentials, and runbook handed off to your team (or our managed service).
Where We Deploy
Austin-area colocation facilities.
We work with Austin's major colocation providers and can deploy in any facility that meets your power and connectivity requirements. We're a recommended integrator at several local data centers.
Austin, TX Core
Ladybird Lake · Domain area · North Austin corridor
Round Rock / Cedar Park
Dell's backyard — dense data center market north of Austin
Texas Statewide
Houston · San Antonio · Dallas deployments on request
Ready to rack your AI infrastructure?
We handle the physical deployment so your team can focus on the software.